Sacramento’s Clean Water Project

Nov 06

Sacramento’s Clean Water Project

Construction of the Sacramento Regional Wastewater Treatment Plant upgrade, also known as, the EchoWater Project, is expected to cost a total of $2 billion and will take place over eight years. Once completed, the wastewater discharges from the treatment plant will meet new state water quality requirements to reduce discharges of ammonia, nitrates and other...

Read More

Sacramento Sewer Building Codes for Flat Spots

Oct 07

Sacramento Sewer Building Codes for Flat Spots

Sacramento building codes require that all drainage systems have a minimum grade of ¼ inch per foot. This means that for every foot the drainage pipe travels, it drops in grade ¼ inch. A flat spot is a section of drain line that has no grade, up or down. A ‘belly’ in the line means that the line dips down and then back up before it resumes the proper grade...

Read More

City of Millbrae Raises Sewer Rates

Aug 14

City of Millbrae Raises Sewer Rates

Residents of Millbrae will sustain an increase to their sewer bill.  Members of City council voted this week for the much needed raise, due to the cost of mandatory sewer infrastructure repairs.  This change is required, in part, due to an ever aging underground infrastructure, but mainly due to the City’s obligation to pay for water laden with bacteria that...

Read More

A Sewer Connection for Lincoln and Auburn

Aug 06

A Sewer Connection for Lincoln and Auburn

The Sewer Main in Auburn is under renovation.  The original plans to do away with this collection site are underway, just a bit later than expected.  The plan is to install a new pump carrying wastewater through a pipeline into the nearby City of Lincoln. Currently, the City is hard at work removing bedrock to pave way for this pipeline connection for Lincoln and...

Read More

Live Demonstrations Coming Soon!

Jun 09

Live Demonstrations Coming Soon!

LIVE DEMONSTRATIONS REGISTRATION JUNE 16TH – 18TH JAM PACKED WITH LIVE DEMOS & THE LATEST CIPP TECH. TUESDAY, JUNE 16TH THRU THURSDAY JUNE 18TH Don’t miss this three day event at our corporate facility in sunny Florida! This event will be jam packed with live demonstrations and the latest CIPP technology. Live Demonstrations: Perma-Main™...

Read More