Sacramento Sewer Building Codes for Flat Spots

Oct 07

Sacramento Sewer Building Codes for Flat Spots

Sacramento building codes require that all drainage systems have a minimum grade of ¼ inch per foot. This means that for every foot the drainage pipe travels, it drops in grade ¼ inch. A flat spot is a section of drain line that has no grade, up or down. A ‘belly’ in the line means that the line dips down and then back up before it resumes the proper grade...

Read More

City of Millbrae Raises Sewer Rates

Aug 14

City of Millbrae Raises Sewer Rates

Residents of Millbrae will sustain an increase to their sewer bill.  Members of City council voted this week for the much needed raise, due to the cost of mandatory sewer infrastructure repairs.  This change is required, in part, due to an ever aging underground infrastructure, but mainly due to the City’s obligation to pay for water laden with bacteria that...

Read More

A Sewer Connection for Lincoln and Auburn

Aug 06

A Sewer Connection for Lincoln and Auburn

The Sewer Main in Auburn is under renovation.  The original plans to do away with this collection site are underway, just a bit later than expected.  The plan is to install a new pump carrying wastewater through a pipeline into the nearby City of Lincoln. Currently, the City is hard at work removing bedrock to pave way for this pipeline connection for Lincoln and...

Read More

Sewer and Water 101

Jun 30

Sewer and Water 101

Summer is indeed here in all its glory.  We know that means rainfall is here, too.  In fact, in many parts of the Country we have had record setting storms.  Precipitation can heavily contribute to an overloaded sewer system.  As a nation, we have over 700 communities that utilize combined sewer systems.  There are some Cities that have separate sewer systems...

Read More

Live Demonstrations Coming Soon!

Jun 09

Live Demonstrations Coming Soon!

LIVE DEMONSTRATIONS REGISTRATION JUNE 16TH – 18TH JAM PACKED WITH LIVE DEMOS & THE LATEST CIPP TECH. TUESDAY, JUNE 16TH THRU THURSDAY JUNE 18TH Don’t miss this three day event at our corporate facility in sunny Florida! This event will be jam packed with live demonstrations and the latest CIPP technology. Live Demonstrations: Perma-Main™...

Read More

Grand Opening Success!

Jun 01

Grand Opening Success!

Perma-Liner recently hosted a grand opening celebration at our new Illinois distribution facility. There were live demonstrations of our state-of-the-art processes, show specials and show day special financing. The event was a great success and we are very proud of our new facility! Check out some great photos from the day! Contact us today to find out more about...

Read More